AGENDA ITEM EXECUTIVE SUMMARY
ITEM TITLE*
title
Conveyance of Right-of-Way and Easements on Town-Owned Land to NCDOT and OWASA for NS RAPID
presenter
RESPONSIBLE STAFF, TITLE, DEPARTMENT*
Caroline Dwyer, Interim Assistant Director, Transit
STAFF RECOMMENDATION*
Staff recommend approving the resolution authorizing the Town Manager to execute documents on behalf of the Town which would transfer portions of certain Town-owned properties adjacent to U.S. 15-501 south of Chapel Hill to the North Carolina Department of Transportation (NCDOT), their successors, and/or assigns, and to Orange Water and Sewer Authority for rights-of-way and easements necessary to relocate individual and joint-use utilities; to construct, maintain, and operate NS RAPID and all associated improvements; and to provide public access to NS RAPID’s sidewalks, BRT stations, and multiuse path (MUP).
body
ACTION/DECISION POINTS*
The Town Council formally approved NS RAPID’s locally preferred design alternative in 2021. The project’s design is nearly complete and rights-of-way and easement needs have been identified. These needs include rights-of-way and easements on portions of Town-owned parcels of land. The donation of rights-of-way and easements on Town-owned parcels for transportation improvement projects that meet Town goals and needs is consistent with Town policies and past precedent.
LEGISLATIVE CONTEXT*
Town Council must authorize the Town Manager to execute documents on behalf of the Town transferring portions of Town-owned properties by donation to OWASA and the NCDOT, their successors, and/or assigns. Said rights-of-way and easements are necessary for the construction of NS RAPID, a Town transportation improvement project.
BACKGROUND AND CONTEXT*
NS RAPID (previously known as North-South Bus Rapid Transit or NSBRT) formally entered Federal Transit Administration (FTA) Project Development in 2016, making the project eligible for an FTA Small Starts Capital Investment Grant. In 2021, the Town Council adopted NS RAPID’s “locally preferred alternative,” finalizing the project’s service mode and corridor alignment and the project began final design activities in late 2022. The project received a Documented Categorical Exclusion (DCE) in 2023, following the completion of a federally mandated National Environmental Policy Act (NEPA) review and, in 2026, was formally recommended for a $149,999,999 grant award after successfully fulfilling all FTA technical requirements. NS RAPID’s funding has been fully appropriated by Congress and Chapel Hill Transit’s formal grant request is currently awaiting the US Department of Transportation’s (USDOT) Office of the Under Secretary’s final review and approval.
NS RAPID is nearing the completion of final design. Utility relocations and other pre-construction activities will begin in early 2027. Roadway, station, and multiuse path construction will begin in late 2027. Timely property acquisition is critical to the project’s construction schedule and utility service providers will not begin to relocate until the NCDOT certifies the necessary rights-of-way and easements. Rights-of-way and easements on several Town-owned parcels are designated as “priority” acquisitions because they are needed for pre-construction utility easements.
The attached exhibits illustrate the relevant rights-of-way and/or easements for each parcel and descriptions of each parcel’s rights-of-way and easements are below.
Parcel 001: “100 SUMAC ROAD,” PIN: 9777937966
Temporary Construction Easement (0.287 acre/12,501 ft2): For construction of NS RAPID’s 12’ multiuse path (MUP).
Right of Way (0.066 acre/2,856 ft2): Provides public access to 12’ MUP.
PARCEL 01A: “107, 107-100, 107-200, 109 SUMAC ROAD,” PIN: 9787045638
Temporary Construction Easement #1 (0.461 acre/20,065 ft2): For construction of NS RAPID’s Southern Village Park & Ride station platform.
Temporary Construction Easement #2 (0.056 acre/2,432 ft2): For construction of NS RAPID’s 12’ multiuse path (MUP).
Permanent Drainage Easement (0.178 acre/7,737 ft2): For construction of a 3-foot “special lateral base ditch” behind MUP for drainage and runoff management.
Right of Way (0.023 acre/1,014 ft2): Provides public access to 12’ MUP.
PARCEL 02A: “E/S US HWY 15-501,” PIN: 9787142926
Note: This parcel was deeded to the Town (as part of a land swap) by the developer of South Creek for purposes of constructing NS RAPID.
Right of Way (0.019 acre/817 ft2): Required to construct and operate a segment of NS RAPID’s northbound bus-only lanes.
PARCEL 015: “100 BENNETT ROAD,” PIN: 9787271011
Dual Utility Easement (0.482 acre/21,014 ft2): Required to construct a series of berm ditches along parcel frontage. The ditches are required to manage runoff generated by the new 5’ sidewalk we are constructing (there are no existing sidewalks on the east side of US 15-501 S in this location).
Permanent Utility Easement/OWASA Sanitary Sewer Easement (0.482 acre/21,014 ft2): Required for the relocation and ongoing maintenance of OWASA water lines that conflicted with NS RAPID’s design. OWASA’s easement “sits” directly on top of (not “in addition to”) the dual use utility easement described above.
PARCEL 018: “W/S HWY 15-501 P86/68,” PIN: 9787186661
Temporary Construction Easement (0.380 acre/16,567 ft2): For the construction of retaining wall #7, construction of the 12’ MUP, relocation of OWASA water lines, and stabilizing existing outfalls and culverts.
Permanent Drainage Easement #1 (0.024 acre/1,055 ft2): For the inspection, maintenance, and repair of outfalls and culverts.
Permanent Drainage Easement #2 (0.012 acre/534 ft2): For the inspection, maintenance, and repair of outfalls and culverts.
Right of Way (0.448 acre/19,535 ft2): For the long-term inspection, maintenance, and repair of retaining wall #7 (required to construct 12’ MUP).
TRADEOFFS, ALTERNATIVES, IMPACTS
If the required easements and rights-of-way on Town-owned parcels are not conveyed to OWASA and to the NCDOT, NS RAPID cannot be constructed.
FINANCIAL IMPACT
The project requires permanent and temporary easements. Temporary easements restore all property rights to the Town when construction is complete. Permanent easements limit certain uses of property that is subject to an easement, but the Town retains ownership of the parcel. Rights-of-way convey all property rights and ownership to the NCDOT for public use. All easements and rights-of-way required to construct and operate NS RAPID are limited to areas immediately adjacent to the public right-of-way and their transfer to OWASA and the NCDOT is unlikely to impact current or future use of the subject Town-owned parcels and are not likely to impact each parcel’s overall value. While NCDOT does compensate property owners when projects require “takings,” these specific rights-of-way and easements are needed for a Town-sponsored project, not a state project.
COMPLETE COMMUNITY CONNECTION
NS RAPID is a once-in-a-generation investment that will change the ways people move around Chapel Hill, reducing dependence on single occupancy automobiles, expanding opportunities for connected, transit-oriented development, and enhancing housing and economic development. NS RAPID’s multiuse path will be the spine of Chapel Hill’s
“Everywhere to Everywhere Greenways” network, which is the defining element of the Town’s Complete Community strategy. High capacity transit service strongly supports Chapel Hill’s economic development, housing affordability, transportation and mobility goals. Multifamily housing is already booming in the project corridor, in anticipation of NS RAPID.
ATTACHMENTS
NS RAPID_Resolution
NS RAPID_Vicinity Map
NS RAPID_Exhibits and Legal Descriptions
end